***************************************************************** Bell XFL-1 Airabonita ***************************************************************** This airplane requires FSW95 or FS5.X. Developed in parallel with the XP-39, the XFL-1 was evaluated by the U.S. Navy in 1940 and 1941. Landing gear problems led to the cancelation of this plane's development contract in Dec. 1941. 1 built. Includes the source .afx and .pcx files August 3, 1998 Eric C. Johnson Brentwood,CA USA ericj@usa.net